Home Our Business

The Gombe urban water supply pipeline project

The Gombe urban water supply pipelineproject was officially signed between CGCOC Nigeria Limited in overseas branchand Gombe state government, and the project construction period is 18 months. Thecontract is about 140km water distribution pipeline in Gombe town, and the waterdistribution will cover the entire Gombe urban area and extend to the Kwamivillage 30 km away, this project completely solved the problem of drinkingwater in both areas eventually.